0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

A Hybrid and Intuitive Work Packaging Approach with Multiple Task Relations, General Work Package Precedence, and BIM in Modular Construction

Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1061/jcemd4.coeng-15856.
  • About this
    data sheet
  • Reference-ID
    10818581
  • Published on:
    12/03/2025
  • Last updated on:
    12/03/2025
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine