A Hybrid and Intuitive Work Packaging Approach with Multiple Task Relations, General Work Package Precedence, and BIM in Modular Construction
Auteur(s): |
Zisheng Liu
Xiao Li Zezhou Gao Yaning Zhang Yue Teng Chengke Wu |
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | Journal of Construction Engineering and Management, avril 2025, n. 4, v. 151 |
DOI: | 10.1061/jcemd4.coeng-15856 |
- Informations
sur cette fiche - Reference-ID
10818581 - Publié(e) le:
12.03.2025 - Modifié(e) le:
12.03.2025