How to get a membrane structure off the drawing board

Author(s):
Medium: journal article
Language(s): English
Published in: Steel Construction, , n. 4, v. 8
Page(s): 244-250
DOI: 10.1002/stco.201510034
Abstract:

This paper highlights the processes that are required to take a membrane structure from the design stage to final fabrication. Those processes involve determining the final geometry, developing an approved seam layout, undertaking material tests to determine stretch characteristics and issuing a final set of fabrication documents. The importance of each step is highlighted and the particular issues as they relate to membrane structures are presented. Particular note is made of the benefit that previous experience in this unique form of construction has in bringing a membrane structure to a successful completion. The paper concludes with a few examples of just what can be achieved when all the final stages of fabrication are carefully followed.

Keywords:
tensile membrane structures compensation
Available from: Refer to publisher
Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1002/stco.201510034.
  • About this
    data sheet
  • Reference-ID
    10072570
  • Published on:
    30/11/2015
  • Last updated on:
    04/10/2016
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine