0
  • DE
  • EN
  • FR
  • Base de données et galerie internationale d'ouvrages d'art et du génie civil

Publicité

How to get a membrane structure off the drawing board

Auteur(s):
Médium: article de revue
Langue(s): anglais
Publié dans: Steel Construction, , n. 4, v. 8
Page(s): 244-250
DOI: 10.1002/stco.201510034
Abstrait:

This paper highlights the processes that are required to take a membrane structure from the design stage to final fabrication. Those processes involve determining the final geometry, developing an approved seam layout, undertaking material tests to determine stretch characteristics and issuing a final set of fabrication documents. The importance of each step is highlighted and the particular issues as they relate to membrane structures are presented. Particular note is made of the benefit that previous experience in this unique form of construction has in bringing a membrane structure to a successful completion. The paper concludes with a few examples of just what can be achieved when all the final stages of fabrication are carefully followed.

Disponible chez: Voir chez l'éditeur
Structurae ne peut pas vous offrir cette publication en texte intégral pour l'instant. Le texte intégral est accessible chez l'éditeur. DOI: 10.1002/stco.201510034.
  • Informations
    sur cette fiche
  • Reference-ID
    10072570
  • Publié(e) le:
    30.11.2015
  • Modifié(e) le:
    04.10.2016
 
Structurae coopère avec
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine