0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

How can 'tasks made ready' during lookahead planning impact reliable workflow and project duration?

Author(s):


Medium: journal article
Language(s): English
Published in: Construction Management and Economics, , n. 4, v. 33
Page(s): 243-258
DOI: 10.1080/01446193.2015.1047878
Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1080/01446193.2015.1047878.
  • About this
    data sheet
  • Reference-ID
    10216383
  • Published on:
    05/12/2018
  • Last updated on:
    19/02/2019
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine