0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Farook R. Hamzeh ORCID

The following bibliography contains all publications indexed in this database that are linked with this name as either author, editor or any other kind of contributor.

  1. Hamzeh, Farook R. / Faek, Farah / Alhussein, Hasnaa (2019): Understanding improvisation in construction through antecedents, behaviours and consequences. In: Construction Management and Economics, v. 37, n. 2 (February 2019).

    https://doi.org/10.1080/01446193.2018.1497189

  2. Malaeb, Zeina / Hamzeh, Farook R. (2021): IPD-inspired framework for measuring stakeholder integration in public-private partnerships. In: Construction Innovation, v. 22, n. 1 (August 2021).

    https://doi.org/10.1108/ci-07-2020-0123

  3. Hamzeh, Farook R. / Alhussein, Hasnaa / Faek, Farah (2018): Investigating the Practice of Improvisation in Construction. In: Journal of Management in Engineering (ASCE), v. 34, n. 6 (November 2018).

    https://doi.org/10.1061/(asce)me.1943-5479.0000652

  4. Hamzeh, Farook R. / El Samad, Ghali / Emdanat, Samir (2019): Advanced Metrics for Construction Planning. In: Journal of Construction Engineering and Management, v. 145, n. 11 (November 2019).

    https://doi.org/10.1061/(asce)co.1943-7862.0001702

  5. Sakka, Fatima El / Assaad, Joseph J. / Hamzeh, Farook R. / Nakhoul, Charbel (2019): Thixotropy and interfacial bond strengths of polymer-modified printed mortars. In: Materials and Structures, v. 52, n. 4 (June 2019).

    https://doi.org/10.1617/s11527-019-1356-7

  6. Al Hattab, Malak / Zankoul, Emile / Hamzeh, Farook R. (2017): Near-Real-Time Optimization of Overlapping Tower Crane Operations: A Model and Case Study. In: Journal of Computing in Civil Engineering, v. 31, n. 4 (July 2017).

    https://doi.org/10.1061/(asce)cp.1943-5487.0000666

  7. Hamzeh, Farook R. / Saab, Issa / Tommelein, Iris D. / Ballard, Glenn (2015): Understanding the role of "tasks anticipated" in lookahead planning through simulation. In: Automation in Construction, v. 49 (January 2015).

    https://doi.org/10.1016/j.autcon.2014.09.005

  8. Hamzeh, Farook R. / Zankoul, Emile / Rouhana, Carel (2014): How can 'tasks made ready' during lookahead planning impact reliable workflow and project duration?. In: Construction Management and Economics, v. 33, n. 4 (July 2014).

    https://doi.org/10.1080/01446193.2015.1047878

Search for a publication...

Only available with
My Structurae

Full text
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine