How Asfinag decides construction methods / Baumethodenentscheidung bei der Asfinag
Author(s): |
Bernhard Schreitl
Thomas Schröfelbauer Christoph Wanker Michael Steiner |
---|---|
Medium: | journal article |
Language(s): | English, German |
Published in: | Geomechanics and Tunnelling, 2011, n. 4, v. 4 |
Page(s): | 317-326 |
DOI: | 10.1002/geot.201100020 |
Abstract: |
The history of autobahn tunnel construction in Austria is about 45 years young, and currently 140 tunnels with a total length of 300 km provide short, safe and environmentally friendly routes for traffic all year round. A further 100 km of tunnel are being designed or are under construction. The present article gives a review of milestones in the history of autobahn tunnel construction and analyses the special features of road tunnels with regard to the method of tunnelling. More detailed descriptions are given of the TBM project A14, 2nd bore of the Pfänder Tunnel and the S1 Danube-Lobau crossing project currently being designed, including the considerations leading to the selection of tunnelling method in each case. |
Keywords: |
swelling rock call for tenders tunneling methods Pfänder Tunnel tendering Danube-Lobau Tunnel groundwater conditions
|