Hieflau power station extension - mechanical tunnelling with innovative solutions / Erweiterung Kraftwerk Hieflau - mechanischer Vortrieb mit innovativen Lösungen
Author(s): |
F. Gappmaier
W. Weber M. Bitschnau |
---|---|
Medium: | journal article |
Language(s): | English, German |
Published in: | Geomechanics and Tunnelling, 2009, n. 1, v. 2 |
Page(s): | 85-93 |
DOI: | 10.1002/geot.200900007 |
Abstract: |
The extension of the Hieflau power station is intended to increase the productive water quantity from 60 to 90 m³/s. The normal power production of the power station, which was commissioned in 1955, will be increased by the planned measures by about 108 GWh/a. In addition to the necessary adaptations and refurbishment of the intake and discharge structures, the headrace tunnel to be constructed represents the most important part of the extension. |
Keywords: |
segment lining
|
Available from: | Refer to publisher |
- About this
data sheet - Reference-ID
10063870 - Published on:
19/11/2010 - Last updated on:
13/08/2014