Heuristic Methods for Finance-Based and Resource-Constrained Project Scheduling Problem
Author(s): |
Wanlin Liu
Jingwen Zhang Wanjun Liu |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Journal of Construction Engineering and Management, November 2021, n. 11, v. 147 |
Page(s): | 04021141 |
DOI: | 10.1061/(asce)co.1943-7862.0002174 |
- About this
data sheet - Reference-ID
10624103 - Published on:
26/08/2021 - Last updated on:
26/08/2021