Heuristic Methods for Finance-Based and Resource-Constrained Project Scheduling Problem
Auteur(s): |
Wanlin Liu
Jingwen Zhang Wanjun Liu |
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | Journal of Construction Engineering and Management, novembre 2021, n. 11, v. 147 |
Page(s): | 04021141 |
DOI: | 10.1061/(asce)co.1943-7862.0002174 |
- Informations
sur cette fiche - Reference-ID
10624103 - Publié(e) le:
26.08.2021 - Modifié(e) le:
26.08.2021