- Performance of Priority Rules for Finance-Based and Resource-Constrained Project Scheduling Heuristics. Dans: Journal of Construction Engineering and Management, v. 150, n. 6 (juin 2024). (2024):
- Bi-objective Optimization for Resource-constrained Robust Construction Project Scheduling. Dans: KSCE Journal of Civil Engineering, v. 28, n. 1 (1 décembre 2023). (2023):
- A reasonable distribution of natural landscape: Utilizing green space and water bodies to reduce residential building carbon emissions. Dans: Energy and Buildings, v. 267 (juillet 2022). (2022):
- Heuristic Methods for Finance-Based and Resource-Constrained Project Scheduling Problem. Dans: Journal of Construction Engineering and Management, v. 147, n. 11 (novembre 2021). (2021):
- Reactive Procedure for Robust Project Scheduling under the Activity Disruptions. Dans: KSCE Journal of Civil Engineering, v. 25, n. 9 (juin 2021). (2021):