Headrace tunnel of the El Alto hydropower project in Panama / Druckstollen des Wasserkraftprojekts El Alto in Panama
Author(s): |
Christian Barwart
Paolo Romualdi Alberto Barioffi |
---|---|
Medium: | journal article |
Language(s): | English, German |
Published in: | Geomechanics and Tunnelling, 2013, n. 4, v. 6 |
Page(s): | 301-311 |
DOI: | 10.1002/geot.201300019 |
Abstract: |
The 3.3 km long headrace tunnel (Lot 2) of El Alto hydropower project in Panama has been tendered as drill and blast excavation. Lot 2 has been arwaded to SELI, Rome/Italy. By using an EPB TBM for tunnel excavation general alignment of tunnel has to be redesigned completely. General and detailed design has been done by viglconsult ZT/Schruns. |
Keywords: |
segmental lining inner lining segment lining steel fibre reinforcement structural analysis of the segment lining
|
Available from: | Refer to publisher |