Hazard identification, risk assessment and control for dam construction safety using an integrated BWM and MARCOS approach under interval type-2 fuzzy sets environment
Author(s): |
Erkan Celik
Muhammet Gul |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Automation in Construction, July 2021, v. 127 |
Page(s): | 103699 |
DOI: | 10.1016/j.autcon.2021.103699 |
- About this
data sheet - Reference-ID
10601930 - Published on:
17/04/2021 - Last updated on:
17/04/2021