Hazard identification, risk assessment and control for dam construction safety using an integrated BWM and MARCOS approach under interval type-2 fuzzy sets environment
Auteur(s): |
Erkan Celik
Muhammet Gul |
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | Automation in Construction, juillet 2021, v. 127 |
Page(s): | 103699 |
DOI: | 10.1016/j.autcon.2021.103699 |
- Informations
sur cette fiche - Reference-ID
10601930 - Publié(e) le:
17.04.2021 - Modifié(e) le:
17.04.2021