Harter Plateau tramway - Tunnelling under the tracks of the Linz main station / Straßenbahnlinie Harter Plateau - Tunnelbau unterden Gleisanlagen des Linzer Hauptbahnhofs

Author(s):


Medium: journal article
Language(s): English, German
Published in: Geomechanics and Tunnelling, , n. 5, v. 2
Page(s): 531-543
DOI: 10.1002/geot.200900041
Abstract:

The local transport hub including a tram tunnel under the Linz main station was constructed from 2001 to 2004 as part of the intensive improvement of public transport in the city. As a logical extension of this project, tramline 3 belonging to Linz Linien GmbH was extended to the so-called Harter Plateau with a total length of 5.3 km. The route runs underground for a length of 1.3 km, mostly under the tracks of the Linz main station. The surface route connects the town of Leonding to the southwest of Linz, with eight new stops. The main emphasis of this article is the underground tunnel sections.

Keywords:
geotechnical design inner lining groundwater dewatering OeGG guideline tunneling scheme support measures tunnel safety scheme
Available from: Refer to publisher

Geographic Locations

Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1002/geot.200900041.
  • About this
    data sheet
  • Reference-ID
    10063820
  • Published on:
    19/11/2010
  • Last updated on:
    13/08/2014
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine