Hard-rock tunnel lithology prediction with TBM construction big data using a global-attention-mechanism-based LSTM network
Author(s): |
Zaobao Liu
Long Li Xingli Fang Wenbiao Qi Jimei Shen Hongyuan Zhou Yulong Zhang |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Automation in Construction, May 2021, v. 125 |
Page(s): | 103647 |
DOI: | 10.1016/j.autcon.2021.103647 |
- About this
data sheet - Reference-ID
10589730 - Published on:
08/03/2021 - Last updated on:
08/03/2021