Hard-rock tunnel lithology prediction with TBM construction big data using a global-attention-mechanism-based LSTM network
Auteur(s): |
Zaobao Liu
Long Li Xingli Fang Wenbiao Qi Jimei Shen Hongyuan Zhou Yulong Zhang |
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | Automation in Construction, mai 2021, v. 125 |
Page(s): | 103647 |
DOI: | 10.1016/j.autcon.2021.103647 |
- Informations
sur cette fiche - Reference-ID
10589730 - Publié(e) le:
08.03.2021 - Modifié(e) le:
08.03.2021