Abstract: |
The determination of the alignment of the Gotthard Base Tunnel made sure not to tunnel directly under the dams of the Vorderrhein AG power stations. The Gotthard Base Tunnel will, however, have to be driven through the zone, which could affect the three arch dams at Nalps, Santa Maria and Curnera. |
Keywords: |
risk assessment displacements risk analysis monitoring system drainage of the rock mass thresholds groutings long term behaviour deformation
|