Freivorbau - ein modernes Bauverfahren im historischen Bestand. Der Neubau der Eisenbahn-Marienbrücke in Dresden
Author(s): |
Th. Bösche
M. Weigelt A. Brunner W. Uhlstein |
---|---|
Medium: | journal article |
Language(s): | German |
Published in: | Beton- und Stahlbetonbau, December 2003, n. 12, v. 98 |
Page(s): | 788-793 |
DOI: | 10.1002/best.200303100 |
Keywords: |
balanced cantilever method bridge building intervention on existing buildings
|
Available from: | Refer to publisher |
Structures and Projects
Geographic Locations
- About this
data sheet - Reference-ID
10037927 - Published on:
23/01/2009 - Last updated on:
15/08/2014