Flow Shop Scheduling for Prefabricated Components Production Considering Parallel Machines and Buffer Constraints
Author(s): |
Miao Yu
Wenxin Ruan Ying Zhou Yu Zhao |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Journal of Construction Engineering and Management, April 2025, n. 4, v. 151 |
DOI: | 10.1061/jcemd4.coeng-15909 |
- About this
data sheet - Reference-ID
10815031 - Published on:
03/02/2025 - Last updated on:
03/02/2025