Feasibility study of TSOB replacing standard high-strength bolt in T-stub connection
Author(s): |
Yuzhu Wang
Lele Sun Peijun Wang Gangling Hou Xuesong Cai Min He |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Structures, April 2024, v. 62 |
Page(s): | 106246 |
DOI: | 10.1016/j.istruc.2024.106246 |
- About this
data sheet - Reference-ID
10770997 - Published on:
29/04/2024 - Last updated on:
29/04/2024