Farm Road Bridge, UK: a new 'top-down' integral bridge using an existing arch as falsework
Author(s): |
Alex Mitchell
Dave Warrior |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Proceedings of the Institution of Civil Engineers - Bridge Engineering, September 2018, n. 3, v. 171 |
Page(s): | 201-209 |
DOI: | 10.1680/jbren.17.00013 |
- About this
data sheet - Reference-ID
10086278 - Published on:
01/12/2018 - Last updated on:
19/02/2019