Farm Road Bridge, UK: a new 'top-down' integral bridge using an existing arch as falsework
Auteur(s): |
Alex Mitchell
Dave Warrior |
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | Proceedings of the Institution of Civil Engineers - Bridge Engineering, septembre 2018, n. 3, v. 171 |
Page(s): | 201-209 |
DOI: | 10.1680/jbren.17.00013 |
- Informations
sur cette fiche - Reference-ID
10086278 - Publié(e) le:
01.12.2018 - Modifié(e) le:
19.02.2019