Fail-safe optimum cable system under cable breakage in cable-stayed bridges. Application to the Queensferry Crossing Bridge
Author(s): |
Noel Soto
Clara Cid Aitor Baldomir Santiago Hernández |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Engineering Structures, March 2023, v. 279 |
Page(s): | 115557 |
DOI: | 10.1016/j.engstruct.2022.115557 |
Structures and Projects
- About this
data sheet - Reference-ID
10708209 - Published on:
21/03/2023 - Last updated on:
21/03/2023