0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Face-saving tactics as an aid to construction negotiation in Hong Kong

Author(s):

Medium: journal article
Language(s): English
Published in: Engineering, Construction and Architectural Management, , n. 6, v. 21
Page(s): 609-630
DOI: 10.1108/ecam-05-2013-0049
Abstract:

Purpose

In construction, the involvement of complex human interactions and incompatible interests among negotiating parties would pose as an obstacle in any negotiation process. The purpose of this paper is to examine the role of face in governing the behaviour of negotiating parties.

Design/methodology/approach

This paper identified the generic types of face-saving tactics used by construction negotiators, investigated the tactic-outcome relationships and examined the effects of face-inducement factors on these relationships with the use of moderated multiple regression (MMR).

Findings

A taxonomy of face-saving tactics has been developed by employing the technique of principal component of factor analysis. The results suggest that the use of face-saving tactics in construction negotiation would statistically result in an achievement of mutual agreement, maintenance of harmony and avoidance of offending situations. The MMR models finally affirm that some tactic-outcome relationships would significantly depend on the face-inducement factors.

Research limitations/implications

This research highlights the usefulness of face-saving tactics in construction negotiation.

Practical implications

The findings revealed that these tactics can help facilitate the achievement of mutual agreement, maintain harmony and avoid offending situations. In this connection, an awareness of the proper use of face-saving tactics is worth-noticing in order to have successful dealings in negotiating project disputes.

Originality/value

In construction, there are some distinct features which may influence the use of face-saving tactics and the behaviour of project dispute negotiators. The findings of this research would provide an insight into promoting proactive and collaborative project dispute resolution.

Geographic Locations

Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1108/ecam-05-2013-0049.
  • About this
    data sheet
  • Reference-ID
    10576452
  • Published on:
    26/02/2021
  • Last updated on:
    26/02/2021
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine