Face-saving tactics as an aid to construction negotiation in Hong Kong

Auteur(s):

Médium: article de revue
Langue(s): anglais
Publié dans: Engineering, Construction and Architectural Management, , n. 6, v. 21
Page(s): 609-630
DOI: 10.1108/ecam-05-2013-0049
Abstrait:

Purpose

In construction, the involvement of complex human interactions and incompatible interests among negotiating parties would pose as an obstacle in any negotiation process. The purpose of this paper is to examine the role of face in governing the behaviour of negotiating parties.

Design/methodology/approach

This paper identified the generic types of face-saving tactics used by construction negotiators, investigated the tactic-outcome relationships and examined the effects of face-inducement factors on these relationships with the use of moderated multiple regression (MMR).

Findings

A taxonomy of face-saving tactics has been developed by employing the technique of principal component of factor analysis. The results suggest that the use of face-saving tactics in construction negotiation would statistically result in an achievement of mutual agreement, maintenance of harmony and avoidance of offending situations. The MMR models finally affirm that some tactic-outcome relationships would significantly depend on the face-inducement factors.

Research limitations/implications

This research highlights the usefulness of face-saving tactics in construction negotiation.

Practical implications

The findings revealed that these tactics can help facilitate the achievement of mutual agreement, maintain harmony and avoid offending situations. In this connection, an awareness of the proper use of face-saving tactics is worth-noticing in order to have successful dealings in negotiating project disputes.

Originality/value

In construction, there are some distinct features which may influence the use of face-saving tactics and the behaviour of project dispute negotiators. The findings of this research would provide an insight into promoting proactive and collaborative project dispute resolution.

Lieux géographiques

Structurae ne peut pas vous offrir cette publication en texte intégral pour l'instant. Le texte intégral est accessible chez l'éditeur. DOI: 10.1108/ecam-05-2013-0049.
  • Informations
    sur cette fiche
  • Reference-ID
    10576452
  • Publié(e) le:
    26.02.2021
  • Modifié(e) le:
    26.02.2021
 
Structurae coopère avec
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine