0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Excavation of a tunnel with conventional method in urbanized context – A case study from Line 15 South of Grand Paris Express

Author(s):



Medium: journal article
Language(s): English
Published in: Geomechanics and Tunnelling, , n. 6, v. 16
Page(s): 692-697
DOI: 10.1002/geot.202300031
Abstract:

As part of the Grand Paris Express project, the work package of Metro Line 15 South Lot T2C is situated near Villiers Sur Marne in the south‐eastern outskirts of Paris. It consists in two mechanized tunnels, principal as well as maintenance and storage site lines, respectively 4.7 and 2.2 km long, connected by a shaft approximately 180 m long (O807), 92 m of which is characterized by a traditional tunnel. This article presents the study carried out for the detailed design of the conventional tunnel which is excavated in the Calcaire de Champigny formation, a succession of layers with typical characteristics of a heavily fractured rock mass alternates with marly others, sometimes showing dissolution phenomena due to the presence of gypsum. Due to the urbanized context and the workface planning, a particular construction stage was also foreseen: the lower part of the section has been excavated by tunnel boring machine when the upper was finalized. The discussion is completed with the results of the monitoring activity, designed to check the correct behavior during and after the excavation process.

Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1002/geot.202300031.
  • About this
    data sheet
  • Reference-ID
    10749378
  • Published on:
    14/01/2024
  • Last updated on:
    14/01/2024
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine