Examining the Effect of Material Management Issues on the Schedule and Cost Performance of Construction Projects Based on a Structural Equation Model: Survey of Indian Experiences
Author(s): |
Santu Kar
Kumar Neeraj Jha |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Journal of Construction Engineering and Management, September 2020, n. 9, v. 146 |
Page(s): | 05020011 |
DOI: | 10.1061/(asce)co.1943-7862.0001906 |
- About this
data sheet - Reference-ID
10426947 - Published on:
13/07/2020 - Last updated on:
13/07/2020