0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Examining the Effect of Material Management Issues on the Schedule and Cost Performance of Construction Projects Based on a Structural Equation Model: Survey of Indian Experiences

Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1061/(asce)co.1943-7862.0001906.
  • About this
    data sheet
  • Reference-ID
    10426947
  • Published on:
    13/07/2020
  • Last updated on:
    13/07/2020
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine