Examining the Effect of Material Management Issues on the Schedule and Cost Performance of Construction Projects Based on a Structural Equation Model: Survey of Indian Experiences
Auteur(s): |
Santu Kar
Kumar Neeraj Jha |
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | Journal of Construction Engineering and Management, septembre 2020, n. 9, v. 146 |
Page(s): | 05020011 |
DOI: | 10.1061/(asce)co.1943-7862.0001906 |
- Informations
sur cette fiche - Reference-ID
10426947 - Publié(e) le:
13.07.2020 - Modifié(e) le:
13.07.2020