Examination of communication processes in design-build project delivery in building construction

Author(s):


Medium: journal article
Language(s): English
Published in: Engineering, Construction and Architectural Management, , n. 6, v. 24
Page(s): 1319-1336
DOI: 10.1108/ecam-12-2015-0192
Abstract:

Purpose

Design-Build (D-B) is a project delivery method in which the owner procures both design and construction services in the same contract from a single legal entity. There is limited research on how communication among parties influences the success of D-B projects. The purpose of this paper is to examine D-B communication issues and provides effective practices on communication to improve D-B procurement processes in the USA.

Design/methodology/approach

The research methodology for this study includes a comprehensive review of literature, survey questionnaire, and structured interviews. A questionnaire was developed to collect data from professionals with an average of 23 years of experience related to D-B procurement. Eight structured interviews were conducted to verify and validate the survey questionnaire results.

Findings

The results showed that the communication issues vary along with each phase of the D-B process. The primary communication practices influencing the success of D-B projects are: establishing clear points of contact; providing clear and understandable information among stakeholders during the D-B process; and the timely sharing of information to all stakeholders.

Research limitations/implications

The chief limitation of this research is that the primary data were mostly opinions from experts although several empirical data were collected for cross-validation. This research did not consider the relationship of relevant contract clauses and communication issues.

Practical implications

The findings from this paper will help professionals better understand the D-B procurement process.

Originality/value

This is one of the first attempts to discuss D-B communication issues in each different phase of a D-B project.

Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1108/ecam-12-2015-0192.
  • About this
    data sheet
  • Reference-ID
    10576597
  • Published on:
    26/02/2021
  • Last updated on:
    26/02/2021
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine