Examination of communication processes in design-build project delivery in building construction
Auteur(s): |
Dai Q. Tran
Long Duy Nguyen Allen Faught |
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | Engineering, Construction and Architectural Management, novembre 2017, n. 6, v. 24 |
Page(s): | 1319-1336 |
DOI: | 10.1108/ecam-12-2015-0192 |
Abstrait: |
PurposeDesign-Build (D-B) is a project delivery method in which the owner procures both design and construction services in the same contract from a single legal entity. There is limited research on how communication among parties influences the success of D-B projects. The purpose of this paper is to examine D-B communication issues and provides effective practices on communication to improve D-B procurement processes in the USA. Design/methodology/approachThe research methodology for this study includes a comprehensive review of literature, survey questionnaire, and structured interviews. A questionnaire was developed to collect data from professionals with an average of 23 years of experience related to D-B procurement. Eight structured interviews were conducted to verify and validate the survey questionnaire results. FindingsThe results showed that the communication issues vary along with each phase of the D-B process. The primary communication practices influencing the success of D-B projects are: establishing clear points of contact; providing clear and understandable information among stakeholders during the D-B process; and the timely sharing of information to all stakeholders. Research limitations/implicationsThe chief limitation of this research is that the primary data were mostly opinions from experts although several empirical data were collected for cross-validation. This research did not consider the relationship of relevant contract clauses and communication issues. Practical implicationsThe findings from this paper will help professionals better understand the D-B procurement process. Originality/valueThis is one of the first attempts to discuss D-B communication issues in each different phase of a D-B project. |
- Informations
sur cette fiche - Reference-ID
10576597 - Publié(e) le:
26.02.2021 - Modifié(e) le:
26.02.2021