0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Evaluating the Success of Project Management Information Systems' Comprehensive Planning in Industrialized Building Systems

Author(s):
Medium: journal article
Language(s): English
Published in: Civil Engineering Journal, , n. 7, v. 4
Page(s): 1667
DOI: 10.28991/cej-03091103
Abstract:

The main reason for the failure of most of management information systems is referred to the problems that arise from management factors and strategic components, expectations, complexity, and risks. Finally, the main applicable proposal is giving importance by managers and analysts to the fit between organization and its information system as well as giving attention to training categories in implementation of information system, preparing financial supports and human resource in design, implementation, and development of information system, strengthening progressive factors, and weakening restrictive factors in organization by management to design or develop the system and finally, preparing organizational infrastructures to implement information system. Introduction of an information system has a strong managerial, organizational, and technological impact on industrial building methods. One of the objectives of this study was to identify and introduce key success factors of Project Management Information Systems (PMIS) in Industrialized Building Systems (IBS). The results of hypotheses showed that all dimensions of PMIS influence the performance of projects. But in the second phase of the study, sub-factors were classified using hierarchical analysis approach. This classification helps managers to identify the most important factors and obtain better results concentrating on the main factors compared with using PMIS.

Copyright: © 2018 Roohollah Taherkhani,
License:

This creative work has been published under the Creative Commons Attribution 4.0 International (CC-BY 4.0) license which allows copying, and redistribution as well as adaptation of the original work provided appropriate credit is given to the original author and the conditions of the license are met.

  • About this
    data sheet
  • Reference-ID
    10340960
  • Published on:
    14/08/2019
  • Last updated on:
    02/06/2021
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine