0
  • DE
  • EN
  • FR
  • Base de données et galerie internationale d'ouvrages d'art et du génie civil

Publicité

Evaluating the Success of Project Management Information Systems' Comprehensive Planning in Industrialized Building Systems

Auteur(s):
Médium: article de revue
Langue(s): anglais
Publié dans: Civil Engineering Journal, , n. 7, v. 4
Page(s): 1667
DOI: 10.28991/cej-03091103
Abstrait:

The main reason for the failure of most of management information systems is referred to the problems that arise from management factors and strategic components, expectations, complexity, and risks. Finally, the main applicable proposal is giving importance by managers and analysts to the fit between organization and its information system as well as giving attention to training categories in implementation of information system, preparing financial supports and human resource in design, implementation, and development of information system, strengthening progressive factors, and weakening restrictive factors in organization by management to design or develop the system and finally, preparing organizational infrastructures to implement information system. Introduction of an information system has a strong managerial, organizational, and technological impact on industrial building methods. One of the objectives of this study was to identify and introduce key success factors of Project Management Information Systems (PMIS) in Industrialized Building Systems (IBS). The results of hypotheses showed that all dimensions of PMIS influence the performance of projects. But in the second phase of the study, sub-factors were classified using hierarchical analysis approach. This classification helps managers to identify the most important factors and obtain better results concentrating on the main factors compared with using PMIS.

Copyright: © 2018 Roohollah Taherkhani,
License:

Cette oeuvre a été publiée sous la license Creative Commons Attribution 4.0 (CC-BY 4.0). Il est autorisé de partager et adapter l'oeuvre tant que l'auteur est crédité et la license est indiquée (avec le lien ci-dessus). Vous devez aussi indiquer si des changements on été fait vis-à-vis de l'original.

  • Informations
    sur cette fiche
  • Reference-ID
    10340960
  • Publié(e) le:
    14.08.2019
  • Modifié(e) le:
    02.06.2021
 
Structurae coopère avec
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine