0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Evaluating the impact of construction delays on project duration using machine learning and multi-criteria decision analysis

This publication lists 84 references to other publication(s):

  • About this
    data sheet
  • Reference-ID
    10802339
  • Published on:
    10/11/2024
  • Last updated on:
    17/01/2025
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine