0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Evaluating the impact of construction delays on project duration using machine learning and multi-criteria decision analysis

Author(s):
Medium: journal article
Language(s): English
Published in: Asian Journal of Civil Engineering, , n. 1, v. 26
Page(s): 389-399
DOI: 10.1007/s42107-024-01196-5
Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1007/s42107-024-01196-5.
  • About this
    data sheet
  • Reference-ID
    10802339
  • Published on:
    10/11/2024
  • Last updated on:
    17/01/2025
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine