0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Evaluating the effect of the accelerated construction method on project life-cycle cost

Author(s): (Civil Engineering Department, Faculty of Engineering, Al-Azhar University, Cairo, Egypt)
(Civil Engineering Department, Faculty of Engineering, The American University, Cairo, Egypt)
(Civil Engineering Department, Faculty of Engineering, Al-Azhar University, Cairo, Egypt)
Medium: journal article
Language(s): English
Published in: Infrastructure Asset Management, , n. 3, v. 10
Page(s): 1-18
DOI: 10.1680/jinam.23.00021
Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1680/jinam.23.00021.
  • About this
    data sheet
  • Reference-ID
    10738883
  • Published on:
    03/09/2023
  • Last updated on:
    19/09/2023
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine