Evaluating the effect of the accelerated construction method on project life-cycle cost
Auteur(s): |
Mohamed Ehab El-Far
(Civil Engineering Department, Faculty of Engineering, Al-Azhar University, Cairo, Egypt)
Reda Abass Sabry (Civil Engineering Department, Faculty of Engineering, The American University, Cairo, Egypt) Mostafa Kotb (Civil Engineering Department, Faculty of Engineering, Al-Azhar University, Cairo, Egypt) |
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | Infrastructure Asset Management, septembre 2023, n. 3, v. 10 |
Page(s): | 1-18 |
DOI: | 10.1680/jinam.23.00021 |
- Informations
sur cette fiche - Reference-ID
10738883 - Publié(e) le:
03.09.2023 - Modifié(e) le:
19.09.2023