Mohamed Ehab El-Far
- Evaluating the effect of the accelerated construction method on project life-cycle cost. Dans: Infrastructure Asset Management, v. 10, n. 3 (septembre 2023). (2023):
- Controlling fast-track construction method variables (time, cost and quality). Dans: Infrastructure Asset Management, v. 10, n. 2 (juin 2023). (2023):