Controlling fast-track construction method variables (time, cost and quality)
Auteur(s): |
Mohamed Ehab El-Far
(Al-Azhar University, Cairo, Egypt)
Mostafa Kotb (Civil Department, Al-Azhar University, Cairo, Egypt) Reda Sabry (American University in Cairo, Cairo, Egypt) |
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | Infrastructure Asset Management, juin 2023, n. 2, v. 10 |
Page(s): | 103-112 |
DOI: | 10.1680/jinam.23.00001 |
- Informations
sur cette fiche - Reference-ID
10729759 - Publié(e) le:
30.05.2023 - Modifié(e) le:
04.08.2023