0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Controlling fast-track construction method variables (time, cost and quality)

Author(s): (Al-Azhar University, Cairo, Egypt)
(Civil Department, Al-Azhar University, Cairo, Egypt)
(American University in Cairo, Cairo, Egypt)
Medium: journal article
Language(s): English
Published in: Infrastructure Asset Management, , n. 2, v. 10
Page(s): 103-112
DOI: 10.1680/jinam.23.00001
Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1680/jinam.23.00001.
  • About this
    data sheet
  • Reference-ID
    10729759
  • Published on:
    30/05/2023
  • Last updated on:
    04/08/2023
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine