Erneuerung des Gleistragwerks am Göltzschtalviadukt - 160-jährige Gewölbebrücke erhält einen modernen Fahrweg für den elektrifizierten Eisenbahnverkehr
Author(s): |
Thomas Bösche
Lutz Buchmann Matthias Sieber Karl-Heinz Döring |
---|---|
Medium: | journal article |
Language(s): | German |
Published in: | Beton- und Stahlbetonbau, February 2014, n. 2, v. 109 |
Page(s): | 88-95 |
DOI: | 10.1002/best.201300081 |
Abstract: |
The renewal of the track supporting structure at the Göltzschtalviadukt - A 160 year old arch bridge with a new track for the electric railwayDue to the planned electrification of the railway-track from Reichenbach to Hof by the Deutsche Bahn an enlargement of the bridge-head of the Göltzschtalviadukt had to be realised in a very short time. By using of a cantelivered structure the conditions for a modern track for speeds up to 160 km/h should been created. At the same time the space for the fastenings of the catenary masts had to be erected. In addition to a variety of construction and management constraints were the aspects of historic preservation at the center of planning and construction. From the conflict between the requirements of a modern infrastructure and the desire to preserve existing peculiarities resulted interesting compromise solutions |
Keywords: |
rehabilitation
|
Available from: | Refer to publisher |
Structures and Projects
Structure Types
- About this
data sheet - Reference-ID
10069739 - Published on:
14/02/2014 - Last updated on:
13/08/2014