Empirical Evidence of Extension of Time in Construction Projects

Author(s): (Manager Contracts, Infrastructure Development Authority, Ground Floor, 7 C-1, Gulberg III, Lahore, Punjab 54000, Pakistan.)
(Lecturer, Dept. of Construction Engineering and Management, NIT-SCEE, National Univ. of Sciences and Technology, H-12, Islamabad 44000, Pakistan.)
(Lecturer, Dept. of Construction Engineering and Management, NIT-SCEE, National Univ. of Sciences and Technology, H-12, Islamabad 44000, Pakistan.)
(Assistant Professor, Dept. of Construction Engineering and Management, NIT-SCEE, National Univ. of Sciences and Technology, H-12, Islamabad 44000, Pakistan (corresponding author).)
(Professor, Dept. of Water Resources Engineering and Management, NICE-SCEE, National Univ. of Sciences and Technology, H-12, Islamabad 44000, Pakistan.)
Medium: journal article
Language(s): English
Published in: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, , n. 3, v. 9
Page(s): 04517008
DOI: 10.1061/(asce)la.1943-4170.0000217
Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1061/(asce)la.1943-4170.0000217.
  • About this
    data sheet
  • Reference-ID
    10579864
  • Published on:
    08/03/2021
  • Last updated on:
    08/03/2021
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine