0
  • DE
  • EN
  • FR
  • Base de données et galerie internationale d'ouvrages d'art et du génie civil

Publicité

Empirical Evidence of Extension of Time in Construction Projects

Auteur(s): (Manager Contracts, Infrastructure Development Authority, Ground Floor, 7 C-1, Gulberg III, Lahore, Punjab 54000, Pakistan.)
(Lecturer, Dept. of Construction Engineering and Management, NIT-SCEE, National Univ. of Sciences and Technology, H-12, Islamabad 44000, Pakistan.)
(Lecturer, Dept. of Construction Engineering and Management, NIT-SCEE, National Univ. of Sciences and Technology, H-12, Islamabad 44000, Pakistan.)
(Assistant Professor, Dept. of Construction Engineering and Management, NIT-SCEE, National Univ. of Sciences and Technology, H-12, Islamabad 44000, Pakistan (corresponding author).)
(Professor, Dept. of Water Resources Engineering and Management, NICE-SCEE, National Univ. of Sciences and Technology, H-12, Islamabad 44000, Pakistan.)
Médium: article de revue
Langue(s): anglais
Publié dans: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, , n. 3, v. 9
Page(s): 04517008
DOI: 10.1061/(asce)la.1943-4170.0000217
Structurae ne peut pas vous offrir cette publication en texte intégral pour l'instant. Le texte intégral est accessible chez l'éditeur. DOI: 10.1061/(asce)la.1943-4170.0000217.
  • Informations
    sur cette fiche
  • Reference-ID
    10579864
  • Publié(e) le:
    08.03.2021
  • Modifié(e) le:
    08.03.2021
 
Structurae coopère avec
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine