The Effect of Welded Splice with Predetermined Gap of Concrete Spun Pile on The Response of Low Strain Integrity Test

Author(s):

Medium: journal article
Language(s): English
Published in: Civil Engineering Dimension / Dimensi Teknik Sipil, , n. 2, v. 24
Page(s): 109-114
DOI: 10.9744/ced.24.2.109-114
Abstract:

This paper presents the velocity wave of concrete spun piles with welded splice. The stress wave velocity was recorded using Pile Integrity Test. Two specimens were prepared in the experiment. The first sample was prepared visually no gap between the two end-plates of connected  piles, while the second  specimen was prepared by inserting 5mm thick steel plate into the splice to create a gap in its connection. The results show that a spike of reflecting stress wave still develops at the splice with and without gap, regardless the splice was welded in full circle. The relatively high spikes of reflecting waves at pile toe are noticed for both specimens with and without gaps. It shows that the full welded splice able to transfer stress wave velocity.  A good quality of welded splice can be indicated by the reflecting wave at the pile toe, regardless the reflecting wave development at the splice.

Copyright: © All right reserved 2022. Civil Engineering Dimension
License:

This creative work has been published under the Creative Commons Attribution 4.0 International (CC-BY 4.0) license which allows copying, and redistribution as well as adaptation of the original work provided appropriate credit is given to the original author and the conditions of the license are met.

  • About this
    data sheet
  • Reference-ID
    10699684
  • Published on:
    10/12/2022
  • Last updated on:
    15/02/2023
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine