Earned Duration Management Control Charts: Role of Control Limit Width Definition for Construction Project Duration Monitoring
Author(s): |
Rodrigo Votto
Linda Lee Ho Fernando Berssaneti |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Journal of Construction Engineering and Management, September 2021, n. 9, v. 147 |
Page(s): | 04021108 |
DOI: | 10.1061/(asce)co.1943-7862.0002135 |
- About this
data sheet - Reference-ID
10624128 - Published on:
26/08/2021 - Last updated on:
26/08/2021