- Earned Duration Management Control Charts: Role of Control Limit Width Definition for Construction Project Duration Monitoring. In: Journal of Construction Engineering and Management, v. 147, n. 9 (September 2021). (2021):
- Use of regression trees to predict overweight trucks from historical weigh-in-motion data. In: Journal of Traffic and Transportation Engineering (English Edition), v. 7, n. 6 (December 2020). (2020):
- Asphalt Binder Linear Amplitude Sweep Test: Contribution Related to the α-Value Estimation. In: Journal of Materials in Civil Engineering (ASCE), v. 33, n. 2 (February 2021). (2021):
- Applying and Assessing Performance of Earned Duration Management Control Charts for EPC Project Duration Monitoring. In: Journal of Construction Engineering and Management, v. 146, n. 3 (March 2020). (2020):