0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

A dynamic Modelling of Labor Productivity Impacts Arising from Change Orders in Road Projects

This publication has been cited in the following 1 other publication(s):

  • About this
    data sheet
  • Reference-ID
    10600653
  • Published on:
    17/04/2021
  • Last updated on:
    17/02/2022
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine