0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

A dynamic Modelling of Labor Productivity Impacts Arising from Change Orders in Road Projects

Author(s): (University of Central Florida, 6243, Civil Engineering , Orlando, Florida, United States;)
(University of Central Florida, 6243, Civil Engineering , Orlando, Florida, United States, 32816-2368;)
(University of Central Florida , Construction Program, Orlando, United States, ;)
Medium: journal article
Language(s): English
Published in: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, , n. 2, v. 49
Page(s): 1-12
DOI: 10.1139/cjce-2020-0456
Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1139/cjce-2020-0456.
  • About this
    data sheet
  • Reference-ID
    10600653
  • Published on:
    17/04/2021
  • Last updated on:
    17/02/2022
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine