Developing a building information modeling–based performance management system for public–private partnerships

Author(s):





Medium: journal article
Language(s): English
Published in: Engineering, Construction and Architectural Management, , n. 8, v. 27
Page(s): 1727-1762
DOI: 10.1108/ecam-06-2019-0328
Abstract:

Purpose

Effective performance management (PM) in public–private partnership (PPP) projects is critical to realizing value for money (VFM). This study aims to provide an in-depth understanding of problems existing in PPP PM and possible avenues for improvement, presenting an experimental system to verify that building information modeling (BIM) and other information communication technologies can improve PPP PM.

Design/methodology/approach

The mixed research method adopted in this study combined empirical research with experimental research. Semistructured interviews were used to ascertain the current situation of PPP PM with the help of Nvivo software. A BIM-based performance management system (BPMS), which combines BIM with Web and Cloud technology, was then constructed to achieve performance monitoring, performance measurement, and performance-based payment. Finally, a case study was introduced to explain the function application of the proposed system.

Findings

The case demonstration verified is found to verify that the developed BIM-based execution framework for PPP PM can effectively guide stakeholders toward achieving mixed PM, promote effective PM, and improve work efficiency with the support of BIM and other information and communication technologies.

Originality/value

Through the development of a BPMS for PPP projects, the effectiveness and efficiency of PM are improved. Practical PM applications are also provided to different stakeholders, through which the key performance indicators and the behaviors of the government and private-sector partners can be monitored to form a more comprehensive and reasonable PM mechanism and promote the realization of VFM in PPP projects.

Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1108/ecam-06-2019-0328.
  • About this
    data sheet
  • Reference-ID
    10576917
  • Published on:
    26/02/2021
  • Last updated on:
    26/02/2021
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine