Determining the probability distribution of rework costs in construction and engineering projects
Author(s): |
Peter E. D. Love
Chun-Pong Sing |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Structure and Infrastructure Engineering, November 2013, n. 11, v. 9 |
Page(s): | 1136-1148 |
DOI: | 10.1080/15732479.2012.667420 |
- About this
data sheet - Reference-ID
10143432 - Published on:
06/12/2018 - Last updated on:
06/12/2018